2008-07-18
2008-07-15
2008-07-11
Elevators for "Demidov" center
ThyssenKrupp Elevator company has concluded the contract on delivery and installation of 31 elevators for the business center "Demidov".
The delivered elevators are an embodiment of the exclusive and stylish design combining matte glass, stainless steel, mirror and granite floor.
The time of elevating from the first floor to the top (33 floor) will not exceed 30 seconds.
The delivered elevators are an embodiment of the exclusive and stylish design combining matte glass, stainless steel, mirror and granite floor.
The time of elevating from the first floor to the top (33 floor) will not exceed 30 seconds.
2008-07-05
Small video of Antey-3 construction.
You can here sound of construction process... 35 floors completed by now, 17 floors left... (-:
Business center "Demidov" project
"Demidov" is the business center, situated in Ekaterinburg-City district, on the side of Iset-river. "Demidov" center consists of two buildings.
The heart of first (9-stores) building is congress-hall. It's located in the center of the building under large dome of glass. Congress-hall's area is 2500 sq.meters. and it can seat 1000 people. There will be shop gallery, cafes and fitness-center with water pull.
Second building is 33-stores high rise tower with offices and helipad on the roof.
Both buildings will be finished in the beginning of 2009 year.


The heart of first (9-stores) building is congress-hall. It's located in the center of the building under large dome of glass. Congress-hall's area is 2500 sq.meters. and it can seat 1000 people. There will be shop gallery, cafes and fitness-center with water pull.
Second building is 33-stores high rise tower with offices and helipad on the roof.
Both buildings will be finished in the beginning of 2009 year.


Subscribe to:
Posts (Atom)

